Control technology justification to include economic analysis, if required.
The provisions for allowing exemptions from certain requirements for PSD-subject sources as specified in 40 CFR 52.21(i) as amended through October 20, 2010, are adopted by reference.33.3(10) Control technology review.
Instead, the requirements in paragraph (k)(1) of this section shall apply with respect to the national ambient air quality stand- ards for ozone in effect on the date the Administrator first published a public notice of a preliminary determination or draft permit.(j) Control technology revie .
Control technology shall be determined according to Subparagraph (1) of this Paragraph.
Control technology shall be in place and operating as soon as practical but not to exceed 12 months from the date that the permit is issued for control technology.
We offer a wide range of technology services. Our expertise goes far beyond the design and development process. We also offer turnkey installation, post installation support, and a wide variety of integration services.
Learn more
Previous: 1.1: Components of an Information System
Next: Differences Between Stainless Steel and Sterling Silver: A Guide for Jewelry Makers
Comments
Please Join Us to post.
0